ALCON LABORATORIES Pic 1 | Pic 2
LINE 17 BAG FILL PROJECT

To have a new process line installed for bag-filling operations in an existing area of the plant.

Install new filling equipment, compounding reactors, sanitary pumps and stainless steel tubing to service the new Line 17 Bag Line. Reactors and piping were installed in the existing compounding area located on the 2nd floor and piping was installed thru a maze of existing ducts and utilities to the new Line 17 area. Welding of the piping was completed by the orbital welding process.